Locating what is already there
Before any digging in New Jersey, existing underground facilities have to be marked out through the state's One Call system (811). Streets carry gas, electric, telecom, water and sewer lines in close quarters, and knowing where they run is the first safety step on any utility job.
Opening the trench
The excavation is planned around the pipe: depth, grade, width and how the trench will be protected while crews work in it. On a street, it also means planning traffic control and keeping driveways usable where possible.
Installing or repairing the pipe
With the trench open and protected, the crew installs new pipe or repairs the existing line. Our facility is stocked with the most popular pipe sizes and types, which helps keep jobs moving and matters even more in emergencies. We explain why in why stocked pipe and material matter.
Backfill and restoration
Backfilling properly, in compacted layers, protects the new pipe and prevents the road surface from settling later. Then the surface is restored: pavement, curb, sidewalk or lawn. Because our masonry division handles concrete curbing and walkways, restoration can stay with the same company.